Client:Power Water
Completed:2019-20
Location:Ramingining, Goulbourn Island, Alcoota, Umbakumba, Stirling (Wilora)
Scope:Installation of the DT240, DT240E, FT12, and FTS415 control systems.
DT240 and DT240E are automated fuel transfer systems that pumps fuel from the selected bulk tank to the power station day tank which gravity feeds to the generator fuel tanks ensuring a reliable fuel source during operation.
FTS12 & FTS415 are fuel pump control systems that control the transfer of fuel from the barge landing holding tank to the power station bulk tanks. These systems can be set to deliver fuel at any desired quantity over a certain time period with a duel shutdown/stop safety system.
Challenges:Remote location, Design of custom system
Outcome:On time, on budget, happy customer.